How to Apply for a MEPCO Domestic Connection

Applying for a domestic electricity connection with MEPCO (Multan Electric Power Company) is a simple process. Whether you’ve moved into a new home or need electricity for a newly built property, this guide will help you understand the steps required to apply for a new MEPCO domestic connection. Below is a detailed explanation of each step, from gathering the required documents to applying.

Steps for ConnectionDetails
Gather required documentsCollect ID, ownership proof, and bills
Fill out the application formComplete the form online or at the office
Submit the applicationProvide forms and documents to MEPCO
Pay the connection feeMake the required payment for processing

Gather Required Documents

The first step in applying for a domestic connection is to gather the necessary documents. You will need:

  • A copy of your CNIC (National Identity Card)
  • Proof of ownership of the property (such as a registry or sale deed)
  • A recent electricity bill (if the property has an existing connection)
  • No-objection certificate (NOC) from the property owner (if you’re renting)

Ensure that all documents are up to date and properly attested. Missing or incorrect documents can delay the application process.

Fill Out the Application Form

Once you have all the necessary documents, the next step is to fill out the MEPCO application form. You can either download the form from MEPCO’s official website or obtain a hard copy from the nearest customer service center. The form requires basic information such as your name, address, contact number, and property details. Be sure to complete the form accurately to avoid delays in processing.

Submit the Application

After completing the form and gathering all the documents, submit them to the nearest MEPCO office. You can also submit the application online through MEPCO’s website if this option is available. The staff at the customer service center will review your application and inform you if any additional documents or information are required.

ALso Read: MEPCO Bill Paid Status Check Online 2024 – Easy Ways

Pay the Connection Fee

Once your application is approved, MEPCO will issue a demand notice, which includes the connection fee and any other applicable charges. You must pay the fee at the designated bank, and once the payment is confirmed, MEPCO will proceed with installing your electricity connection.

  • Pay the fee at authorized banks
  • Keep the receipt as proof of payment
  • MEPCO will schedule the installation after the payment

Inspection and Installation

After payment, an MEPCO technician will visit the property to inspect the site and verify the details of your application. Once the inspection is completed and approved, MEPCO will install the meter and the electricity connection at your home. This process usually takes a few days, depending on the availability of staff and equipment.

Conclusion

Applying for a MEPCO domestic connection is a straightforward process if you follow the correct steps. By gathering the required documents, filling out the application form, submitting it on time, and paying the connection fee, you can ensure a smooth and quick installation of your electricity connection. Always keep copies of your documents and payment receipts for future reference, and follow up with MEPCO if there are any delays in the process.